LingoScholarLiterature. Evidence. Research.
Research programmes
Open studyCatalogueAcademic access
Return to the research atlas
Public research reference
2022Revista Árvore

CAN TIMBER HOUSES BE PRODUCTIVELY FASTER TO BUILD THAN OTHER BUILDINGS?

Victor Almeida De Araujo; Juliano Souza Vasconcelos; Juliana Cortez-Barbosa; Elen Aparecida Martines Morales; Maristela Gava; José Nivaldo Garcia

CLTBeamsSustainability
Open publisher page
01 / From the publisher

Abstract

ABSTRACT To identify the time spent with the different construction techniques of timber houses, this study evaluates the execution time of different models available in Brazil. Using face-to-face interviews, semi-structured questionnaires were randomly applied to collect average time according to distinct production methods. The most efficient techniques were: ‘clapboard and wainscot’, ‘post-and-beam’, and ‘log-home’ using artisanal production; ‘clapboard and wainscot’, ‘stick framing with masonry’, and ‘post-and-beam’ in semi-industrial process; and, ‘modular for building sites’, ‘modular in cross-laminated timber’ and ‘modular woodframe’ in industrial production. Different industrial developers were not as agile as artisanal competitors due to production obstacles in customized projects. Timber construction offers lower execution time than masonry, representing an agile form to build a versatile sustainable dwelling.

02 / Cite this paper

Reference

Victor Almeida De Araujo; Juliano Souza Vasconcelos; Juliana Cortez-Barbosa; Elen Aparecida Martines Morales; Maristela Gava; José Nivaldo Garcia. (2022). CAN TIMBER HOUSES BE PRODUCTIVELY FASTER TO BUILD THAN OTHER BUILDINGS?. Revista Árvore. https://doi.org/10.1590/1806-908820220000023

Explore the literature

Follow references, discover citing works and find related studies.